Data Attribution

Gridview aggregates publicly available data from the following sources under their respective open data licences. Attribution is required by those licences and by our own commitment to transparency.

Elexon — Balancing Mechanism Reporting Service (BMRS)

Settlement system prices, provisional and settled curtailment (BOALF/BOAV), battery skip-rate data, wind/solar generation outturn, REMIT generation unavailability notices, interconnector physical flows, and GB system frequency readings are sourced from the Elexon Insights Solution API.

Licence: Elexon Open Data Licence (free to use for non-commercial and commercial purposes with attribution).

Attribution: Data sourced from Elexon's Insights Solution API (data.elexon.co.uk).

National Energy System Operator (NESO)

Transmission constraint flows and costs, and the NESO TEC Register (transmission connection queue) are sourced from the NESO open data portal.

Licence: Open Government Licence v3.0 (OGL).

Attribution: Contains public sector information licensed under the Open Government Licence v3.0. Source: National Energy System Operator (neso.energy).

Distribution Network Operators (DNO)

Distribution-level embedded capacity register data is sourced from individual DNO open-data portals. Ingestion status and licence terms vary by operator:

DNOLicence areasLicenceStatusCadence
National Grid Electricity DistributionWest Midlands, East Midlands, South Western, South WalesWPD Open Data LicenceLiveMonthly (ECR); irregular (CRR)
UK Power NetworksLondon, South Eastern, EasternCC BY 4.0Pending accessMonthly
Northern PowergridYorkshire, North EasternNorthern Powergrid Open Data Licence v1.0LiveMonthly
Electricity North WestNorth WesternCC BY 4.0Pending accessMonthly
SP Energy NetworksSP Distribution (Scotland), SP Manweb (North Wales & Merseyside)CC BY 4.0Pending accessMonthly
Scottish and Southern Electricity NetworksNorth of Scotland, South of Scotland, SouthernUNVERIFIEDUnverifiedUNVERIFIED

Refresh cadences

Data is ingested by an automated cron job running on Cloudflare Workers. The table below shows the advertised refresh cadence for each feed, as defined in the canonical cadence registry.

FeedCadenceSchedule (UTC)
Elexon settlement system prices (grid_status)every 20 minutes*/5 * * * * — dispatched every 20 minutes
Provisional curtailment (Elexon BOALF)every 20 minutes*/5 * * * * — dispatched every 20 minutes
Settled curtailment (Elexon BOAV)daily at 08:00 UTC*/5 * * * * — dispatched at 08:00 UTC
Battery skip-rate provisional (BOD × BOALF)every 20 minutes*/5 * * * * — dispatched every 20 minutes
Battery skip-rate settled (BOAV + per-period BOD)daily at 08:00 UTC*/5 * * * * — dispatched at 08:00 UTC
Wind/solar generation outturn + daily VWAP rollup (Elexon AGWS)every 20 minutes*/5 * * * * — dispatched every 20 minutes
REMIT generation unavailability notices (Elexon BMRS)every 20 minutes*/5 * * * * — dispatched every 20 minutes
Interconnector physical flows (Elexon FUELHH)every 20 minutes*/5 * * * * — dispatched every 20 minutes
Wind/solar/demand forecasts → cannibalization + constraint scoringevery 20 minutes*/5 * * * * — first job of the 20-minute dispatch
NESO boundary constraint flows + costsdaily at 09:00 UTC*/5 * * * * — dispatched at 09:00 UTC
NESO TEC Register (transmission connections queue)Tuesdays & Fridays at 09:00 UTC*/5 * * * * — dispatched Tue + Fri 09:00 UTC
DNO Embedded Capacity Registers (NGED + NPg live)weekly (Sundays 07:00 UTC)*/5 * * * * — dispatched Sundays 07:00 UTC
BMU reference metadata (Elexon /reference/bmunits)weeklyage-gated inside the 08:00 UTC job — refetches when oldest row > 7 days
GB system frequency 15-second readings (Elexon FREQ)every 5 minutes*/5 * * * * — every tick

Corrections

If you believe any data on Gridview is incorrect or misattributed, please contact us or email [email protected].

Gridview
ContactData AttributionPrivacyTerms
Contains BMRS data © Elexon Limited copyright and database right 2026. Licence terms·Supported by National Energy SO Open Data.